FLNG Design and Technology Training Course
| Start Date | End Date | Venue | Fees (US $) | ||
|---|---|---|---|---|---|
| FLNG Design and Technology Training Course | 09 Aug 2026 | 13 Aug 2026 | Dubai, UAE | $ 3,900 | Register |
| FLNG Design and Technology Training Course | 15 Nov 2026 | 19 Nov 2026 | Riyadh, KSA | $ 3,900 | Register |
FLNG Design and Technology Training Course
| Start Date | End Date | Venue | Fees (US $) | |
|---|---|---|---|---|
| FLNG Design and Technology Training Course | 09 Aug 2026 | 13 Aug 2026 | Dubai, UAE | $ 3,900 |
| FLNG Design and Technology Training Course | 15 Nov 2026 | 19 Nov 2026 | Riyadh, KSA | $ 3,900 |
Introduction
The challenge of an LNG FPSO, is adapting the known onshore technologies to an offshore environment, with motion impacts affecting the process and offloading, as well as space limitations. This 5-day FLNG Design and Technology training course will guide the participant through all the phases of the project from concept design, construction and interfaces to commissioning, start-up and handover. This training course gives a valuable, detailed insight into Floating Liquid Natural Gas development encompassing technical complexities, key design issues, critical drivers and risks related to LNG FPSOs and FRSUs. This training course will arm the participant with a wealth of knowledge to help them advance their project.
This training course will feature:
- The Design Drivers for the Overall Vessel, Topside, Hull and Mooring Systems
- Liquefaction Technologies and Regasification and Offshore LNG Transfer Systems
- Safety, Risk Assessment and Integration Aspects of LNG Production on a Floating Facility
- Dynamic Process Simulation Examples
- Selection Requirements for Equipment and Material
- Interfaces and Commissioning
Objectives
- Identify the Key Design Requirements for an FLNG
- Recognize the Effects of the Ocean Environment on FLNG Design
- Understand the Liquefaction and Regasification Technologies
- Interpret Applicable Rules and Regulations, Industry Standards and Regulations and Environmental Considerations
- Appreciate safety in Design and Operation
By the end of this training course, participants will be able to:
Training Methodology
This FLNG Design and Technology training course will utilise a variety of proven adult learning techniques to ensure maximum understanding, comprehension and retention of the information presented. The daily workshops will be highly interactive and participative. This involves regular discussion between both delegates and training course director. The training course will provide the participant with an in-depth knowledge through detailed information, real-life case studies, photos and video animation.
Who Should Attend?
This training course is suitable to a wide range of professionals but will greatly benefit:
- Designers, Managers and Operators
- Technical Staff, Project Engineers, Engineering Discipline Leads, Engineering Specialists, and Operating Staff
Course Outline
Day 1: Understanding the Basic Concept of an FLNG
-
Introduction to Floating LNG Concepts
-
Advantages and Disadvantages
-
FLNG Vessel Design
-
Class, Rules, Design Codes, Standards and Regulations
-
Design Considerations, Challenges and Limitations
-
Shipbuilding and Offshore Approach
Day 2: Comprehension of the LNG Process Plant
-
The Basic Concept from Well to LNG
-
LNG Specifications
-
Various Gas Treatment Concepts and HHC Removal
-
Various Liquefaction Technologies
-
Production System Challenges and Selection of the Major Equipment
-
Power, Heating and Cooling Systems
-
Regasification
Day 3: The Impact of the Ocean Environment on FLNG Topside Design
-
Key Metocean Design Criteria
-
HullConfiguration and Key Safety and Technology Issues
-
FLNG Topside Modular Design and Layout
-
Interfaces and Interface Management
-
Turret and Swivel Systems
-
SURF and Subsea Interfaces
Day 4: LNG Containment and Transfer System
-
LNG Storage Tank Design
-
Storage Tank Insulation
-
Sloshing Damage
-
Boil-Off Effects (roll over, density stratified liquid layers, natural convection within an LNG tank)
-
Storing Other Products (LPG, condensate, etc.)
-
Tank Loading Preparation
-
LNG Carriers
-
LNG Transfer Systems
-
LNG Carrier Loading Operations
-
Offloading Risks
Day 5: Other Design Requirements
-
Control and Safety Systems
-
Electrical Design
-
Piping and Cryogenic Piping Design
-
Dynamic Process Simulation
-
Safety in Design and Operation
-
FLNG Commissioning